30–36 Week Timeline

From initial consultation to final commissioning, our proven delivery process ensures your facility is completed on time, on budget, and to specification.

Weeks 1-3

Consultation & Assessment

Initial meetings to understand your protection requirements, threat profile, and site preferences. Our specialists conduct preliminary feasibility assessments.

  • Client requirements gathering
  • Threat and risk assessment
  • Site selection guidance
  • Preliminary budget development
  • Non-disclosure agreement execution
Weeks 4-6

Site Survey & Engineering

Comprehensive geological and environmental surveys of the selected site. Engineering team develops preliminary designs based on site conditions.

  • Geological survey and soil analysis
  • Groundwater assessment
  • Utility connection evaluation
  • Access route planning
  • Environmental impact assessment
Weeks 7-10

Design Development

Full architectural and engineering design based on survey results and client specifications. Interactive design reviews ensure alignment with requirements.

  • Structural engineering design
  • Mechanical systems specification
  • Electrical and communication planning
  • Interior layout development
  • 3D visualization and walkthroughs
  • Client design approval
Weeks 11-13

Permitting & Procurement

Permit applications where required, and procurement of long-lead materials. Discretion protocols ensure project confidentiality.

  • Construction permit applications
  • Material procurement and ordering
  • Subcontractor vetting and selection
  • Security protocol establishment
  • Construction schedule finalization
Weeks 14-20

Excavation & Foundation

Site preparation and excavation to design depth. Foundation systems installed with waterproofing and structural reinforcement.

  • Site clearing and access establishment
  • Excavation to design specifications
  • Foundation concrete placement
  • Waterproofing membrane installation
  • Structural steel placement
  • Quality inspections at each phase
Weeks 21-26

Structure & Shell

Primary structure construction including walls, roof systems, and entry points. Blast doors and penetrations installed.

  • Reinforced concrete wall construction
  • Roof slab placement
  • Blast door installation
  • Emergency exit construction
  • Faraday cage integration
  • Backfill and compaction
Weeks 27-31

Systems Installation

Installation of all mechanical, electrical, and life support systems. HVAC, filtration, power, and communication infrastructure completed.

  • HVAC and NBC filtration systems
  • Electrical distribution and backup power
  • Plumbing and water systems
  • Communication infrastructure
  • Security systems and access control
  • Fire suppression installation
Weeks 32-34

Interior Finishing

Interior construction and finishing to client specifications. Living spaces, storage, and amenity areas completed.

  • Wall finishing and painting
  • Flooring installation
  • Kitchen and bathroom completion
  • Furniture and fixture installation
  • Storage system setup
  • Lighting and controls programming
Weeks 35-36

Testing & Commissioning

Comprehensive testing of all systems under operational conditions. Client training and handover of completed facility.

  • System integration testing
  • NBC filtration verification
  • Backup power load testing
  • Security system commissioning
  • Client training and orientation
  • Documentation handover
  • Final inspection and acceptance

Timeline Variations

Standard timelines apply to typical installations. Complex projects, challenging site conditions, or extensive customization may extend delivery. Modular pod solutions can reduce timelines to 16-20 weeks.

Confidentiality

All construction activities are conducted under strict security protocols. Work crews are vetted, site access is controlled, and project details are compartmentalized to protect client privacy.

Quality Assurance

Independent inspections occur at every major milestone. We maintain complete documentation for warranty purposes and provide ongoing support after handover.

Ready to Start Your Project?

The sooner you begin, the sooner you're protected. Initial consultations typically schedule within one week.